Jeff requested 1 quotes from Plumbers in Ringwood East
Re-Bedding and Pointing Double Storey roof requires Safety Rail
Remove all old cracked mortar from under all Ridge capping. Prep all ridge capping with cup grinder prior to Re-bedding.
Re-bed all Ridge capping. Install Valley seal to valleys.
Re-Point all Ridge capping using Flexible Pointing.
Clean out gutters. Check Down-pipes.
Replace any leaking/broken tiles.
All related debris removed from the property and disposed. Removal of Safety Rail
LA PLUMBING - DNC
ROTATING VENTS INSTALLED
ROTATING VENTS INSTALLED ON ROOF OF FACTORY
Flat roof repair to stop water leaks
Flat roofed unit. in the past, sections of the roof have been lifted and...
Roof restoration
i need my roof redone. replace broken tiles, recementing, edges and the rest...
Roof restoration
i need my roof redone. replace broken tiles, recementing, edges and the rest...