Sue requested 3 quotes from Tilers in Taylors Lakes
walls have already been plastered and waterproofed. we nee someone to complete the wall tiles in the bathroom approx. 20 metres floor to ceailing
As painting well-DNC
Zarif Tiling & Waterproofing Pty Ltd
First Class Handyman
Tile floor and bathroom
Need kitchen, hallway, laundry and bathroom tiled. Approximately 32m of floor...
Tiling bathroom and water-proofing
Bathroom to be tiled - floor (1740mm x 1315)/ bath hob (side 1520 x 600 + hob...
Tiling in bathroom required for the floor, walls and shower, need job done.
Tiling in bathroom required for the floor, walls and shower, need job done.
Bathroom tiling
screed base to shower cubicle, tiling wall and floor, waterproof membrane to...