Julie requested 2 quotes from Tilers in Mount Lawley
Removal of tiles from wet areas has left uneven surface that needs to be made suitable for installation of new wooden floors. There is no tiling required.
Have a tiling job availble in about 4 weeks. 90m2 wall tiles, 40m2 floor
Tilling new house, 3 bathrooms and 2 toilets.
Tiling kitchen dining room etc.
tiling kitchen dining room etc.
Slate floor needs stripping and resealing
slate floor needs stripping and then resealing
Wall tile removal and reinstall
Bath/shower wall return tile removal, waterproof and re-tile. Materials supplied