Ian requested 3 quotes from Tilers in Russell Lea
There are two jobs that need to been complited but there wil be a month between them, the bathroom is aboout 2meter by 3 meters, the flour and walls, and shower area, and will need water proffing, they there the kitchen 3.7 meters by 3.25 meters water profing and tilling floor.
Lam Tiling
Tiling to kitchen floor and splashback
Remove slpash back tiles, remove lino on floor.
Tile splash back and floor
Tile repair 2 tiles 300*600
Two bottom shower screen tiles are cracked - I will get the shower screen...
Floor Tiling
45sqm of floor tiling to be completed in a 2 B/R apartment in Drummoyne....
New bathroom tiled
waterproof shower floor and walls. scree bathroom floor approx 25 mm thick....