Jane requested 2 quotes from Tilers in Glen Waverley
Shower requires base to be removed and replaced with a screed base. Half of the wall tiles need to be removed and replaced. All of the floor tiles will need to be replaced in bathroom. I have purchased tiles and job is ready to go ASAP. There is a lot of mold growning in the shower as we believe that behind the current base it is damp.
Pepi Building Services
Floor levelling to lay floating bamboo floor
we took out tiles until we reached wooden subfloor which is not level nor...
Need a quote for a Tiler for Screeding and waterproofing ,decking
need a Tiler for Screeding and waterproofing decking
Laundry Tiling
We need to hire a Tiler to tile a laundry floor (4 x 1.7 m, irregular). A...
Bathroom and toilet tiling
bathroom to be tiled, walls, floor, tiled shower floor instead of shower base...