Lucia requested 3 quotes from Tilers in Mont Albert
Replace poor workmanship. Remove existing tiles on the bathroom floor, level floor, waterproof and replace tiles on floor.
kj 's tiling service
Ali Group Tiling
Tiling bathroom, toilet and fireplace Friday/Monday.
Tiling of bathroom, fireplace and toilet. Pictures available on request to...
Repair Leaking Shower
Intergrated shower is leaking water under the tiles. Previous builder not...
Screed Shower base
1200 x 900mm shower base needs to be screeded in order for a tiled shower...
Tiling of Sunpod by pool 2.4m x 1.2m pebble mesh tiles on concrete
Lay Pebble Mesh tiles on Sunpod by pool. Will have water running over it but...