Floor and wall tiles for the kitchen that is being renovated

Roger requested 3 quotes from Tilers in Viewbank

  Remove old Kitchen cabinets, remove floor tiles (existing tiles are on top of cement sheet), remove old tiles from the wall, prepare all surfaces for retiling. Remove skirting (where needed) and also remove cornice where needed.
Retile floor tiles and put skirting on the floor (ready for the cabinets to be installed) .
Retile the wall and put back the cornice after the cabinets are installed.

Tilers that Responded

Accredited Tiling - DNC

Wide group tiling

Royalden tilling and painting pty ltd

Quote Details

  • Suburb Viewbank, VIC 3084
  • Specialisation Floor and wall tiling
  • Date Listed 14 May 2014 - 4:55 pm

Similar Quote Requests

Tiling new bathroom
Tiling new bathroom, floor and walls (floor to ceiling).

Caulking bottom of splashback
The grout and silicon at base of kitchen splashback has failed - need it...

Tiling required for bathroom and splash back
Bathroom and kicten splash back needs to be tiled

I need a house tiled.
I need tiler to do bathroom approx. 2.5m x 1.9m then half walls,...