Dean requested 3 quotes from Tilers in Berserker
Please find spec as requested
-
- TILER
-
- • Supply and install new floor tiles in dough production area
-
- General tile replacement around store - price based on 2 days labour to remove and replace tiles and treads + .5 days labour to source replacements and grout
Kitchen floor re-tiling plus passages
remove current floor tiles in kitchen, laundry, 2 x toilet and 2 passages and...
Floor Tiling
3-4 square metres of tiles in a shop entryway, Bed Bath & Table store at...
Tiling, 4 rooms 36m2
Need 4 rooms to be tiled all together, bedroom, office, walk in robe and...
Tiler needed for domestic wooden house renovations
Tiler required to perform following works in low set domestic wood house:
*...