Chris requested 3 quotes from Pool Professionals, Spa Professionals in Beverly Hills
Require renovation on marblesheen / pebblecrete pool.
- Some cancerous spots to be cut out.
- re-finishing of the pool.
- waterline and stair tiling.
- paving of the existing coping.
Preference to start the job in 4-6 weeks.
Thanks,
Chris.
Lifestyle designs and Constructions Pty Ltd