Brass top to bat benchtop

Wesley requested 3 quotes from Steel Fabricators in Fitzroy

  We have an existing bar that requires a new brass top applied to it. The top is to have a high polish and needs to fold over the edge. It's about 8 metres long in total

Quote Details

  • Suburb Fitzroy, VIC 3065
  • Specialisation Steel Beams
  • Date Listed 1 Dec 2013 - 10:22 pm

Similar Quote Requests

Structural steel
require structural steel for framing on an extension.

Replace a steel pole to support a car port
My car port is supported by steel/iron poles. One of them is rusty and needs...

Onsite Truss and cleat Welding
Require 2 x truss frames nitre cut and full penetration butt welded,...

Small canopy steel framed & sheeted & erected
site measure. canopy approx. 2.75m x 1.5m. frame up canopy out of rhs & sheet...