Remove tiles from first floorMansard roof and replace with metal sheets

Jon requested 3 quotes from Roofers in Bronte

  approx 17m tiled Mansard roof on first floor to be replaced by Metal Sheets to match the roof. Guttering required. Vents into main roof too. Scaffolding will be erected in next 7 days to provide access

Quote Details

  • Suburb Bronte, NSW 2024
  • Specialisation New Tin & Colourbond Roof
  • Date Listed 4 Sep 2017 - 4:30 pm

Similar Quote Requests

Rem old fbrgls roof from side passage/outdr area sup/fit new laserlite
I'd like to replace some roofing we have over a side passage and outdoor...

Reroute water in flat cliplock roof and seal
We have a failed seal in a cliplock roof. We need to reseal, reroute water...

Metal roof repairs or replace on heritage building
require a inspect and quote on repairs versus reroof on heritage building and...

Leaking porch roof repaired
Metal porch roof leaked in the last downpour and water got into the fuse box,...