Raise & re-level a house 80 sq m concrete stumps between 1 - 1.8m abve grnd

Daniel requested 3 quotes from Restumpers in Yeronga

  My house is approximately 80 m2 on concrete stumps between approx 1m and 1.8m above the ground.

i want it raised to to allow for minimum clearance of 2.4 so i can build under at a later date. the house will also need to be re-leveled as the front has dropped a little.

not all of the stumps will be replaced so i can build usable rooms. the largest free span without a stump is expected to be approx 4m.

Quote Details

  • Suburb Yeronga, QLD 4104
  • Specialisation Relevelling
  • Date Listed 12 Aug 2008 - 8:39 am

Similar Quote Requests

I need 5 concrete stumps replaced
The stumps are all external with good access to house and yard. Each stump is...

Restumping/leveling & underhouse excavation
Removal of some timber & concrete stumps as required, replaced with steel...

Restumping
Replacement of various stumps and re-levelling building.

House levelling & back propping to prepare for re-stumping, complete before 3 July
I require house jacking and propping to be undertaken to re-level the...