Ashwin requested 3 quotes from Renovators in Middle Camberwell
Require shower installation either kit or built + removal of old shower. Water proofing. Relocation of shower head / pipes. Tiling of bathroom walls (tiles supplied). Grouting of bathroom floor. Tiling of toilet floor + toilet walls. Would like job completed before 11th November 2017.
https://imgur.com/a/XrJJq
Outdoor patio tiling
Outdor front door patio tiling 3.1m x 5.7m. (Current surface is concrete.)...
NEW KITCHEN NEEDED
NEW KITCHEN NEEDED
She wants a window to be removed and a wall to be removed as well-
removal of one window and a wall.
KITCHEN RENOVATIONS
KITCHEN RENOVATIONS