Raymond requested 3 quotes from Renovators in Hughesdale
Job includes
a) Remove existing bathroom /toilet in centre
b) Reposition bathroom/toilet to the side
c) Remove toilet and plumbing fittings in rear room
d) Demolish rear & to convert to normal bedroom.
STANDOUT CONSTRUCTIONS
Build a new verandah/porch- plans already drawn
1.8m wide and 6.7m long with steps down about 1.2m. Made of merbau decking...
We have brought a new home on weekend. want someone to help coordinate building works renovations su
decking, new floor coverings, painting, remodel laundry and bathroom, new...
Plastering an arear under the eaves to make a walk-in
I need an area under the eaves plastered to make a walk-in cupboard. There is...
Install dishwasher and rangehood
Dishwasher: there is no existing dishwasher so the cupboards need to be cut...