Redo downstairs with a new concrete slab, put two new bedrooms, rumpus

Sweta requested 3 quotes from Renovators in Ferny Hills

  Downstairs at the moment has water seeping through the ground. The house is approx 30 yrs old but we have not lived downstairs yet. Downstairs has rumpus, toilet, garage and laundry which has to go and a new concrete slab with water proofing has to be laid and new bedrooms, kitchen, bathroom, laundry, and rumpus needs to be built. Internal staircase, new kitchen and bathroom upstairs. Roof cleaning/sealing any leaks and painting the roof. Front verandah needs to be touched up and a new gate needs to be installed.

Quote Details

  • Suburb Ferny Hills, QLD 4055
  • Specialisation Structural renovations
  • Date Listed 3 Nov 2016 - 12:24 am

Similar Quote Requests

Structural Alterations to House for Removal of Internal Load Bearing Walll
Installation of Beams and Posts as per Engineers Plans for Removal of...

Redo downstairs with a new concrete slab, put two new bedrooms, rumpus
Downstairs at the moment has water seeping through the ground. The house is...

Build ensuite in master bedroom
Build ensuite in master bedroom, 2.7 x 0.9m, shower, vanity and toilet

Subbies for a new house - owner build
2 story house, 380 sq metres - I require 1. painter 2. plasterer 3....