Already a Service Central user? Log in here
Registered Service Central users have access to powerful filtering of the Jobs Board, giving you the ability to rapidly sift and filter through all of the jobs available on Service Central.
Sign up now (it's free) and start using it!
Already a Service Central user? Log in here
Full bathroom renovation - 3x3 room, 1956 timber-framed home.
Renovating: Bathroom Renovation
in Greenmount, WA 6056
26 November 2014
Hide Details
Remove old bath, floor tiles, plasterboard to rail @ 1.8m. Owner can assist with demo and disposal. Blue board, re-seal, tile floor and walls to 1.8m - approx 22sqm total. Install double vanity... Remove old bath, floor tiles, plasterboard to rail @ 1.8m. Owner can assist with demo and disposal. Blue board, re-seal, tile floor and walls to 1.8m - approx 22sqm total. Install double vanity to replace single, toilet in place of bath, wider frameless shower; owner can supply if necessary.
Sign up to receive news, updates and special deals!
© 2005- Service Central