Ensuite renovations - replace exist flooring and shower base ready to tile.

Michael Moor requested 3 quotes from Renovators in Fitzroy North

  Ensuite with water damaged floor base (ie particle board) needs repairing. Fixtures and tiling have been removed already. Job requires as much as possible of:
- removing shower base and screen
- replacing floor sheeting in preparation for tiling
- re-installing a shower base and the existing shower screen

May require removal of some wooden floor boards to access full extent of water damage. Replacement (but not polishing) of removed floor board is nice if experience/interest permits.

Will attach photos to job to give general idea.

Renovators that Responded

COZY COTTAGE

Maxabuild

Quote Details

  • Suburb Fitzroy North, VIC 3068
  • Specialisation General Renovations
  • Date Listed 9 May 2013 - 4:48 pm

Similar Quote Requests

Small first floor external balcony requires re-tiling and waterproofing
Balcony is 1.3 m by 3.2 m (approximately). Existing tiling needs to be...

Office renovations - remove partitioning, make good plaster walls, painting
Office approx 4 x 6 metres requires renovation: removal of timber/paster...

Need to renovate and install kitchen and bathroom in a single storey Terrace
Need a builders, to assist in renovation work on a single storey Terrace. eg:...

Remove fake wall
I would like to remove the fake wall that divides my living room and kitchen....