Todd requested 3 quotes from Renovators in Wavell Heights
Need to complete a bathroom renovation by the end of February 2019.
Below is an outline of requirements
• Re-sheet walls and ceiling
• Install new sub-flooring base (FC Sheeting) TBC
• Screeding (if required)
• Complete waterproofing, membrane to Australian Standards (AS)
• Install shower and floor waste drainage
• Tiling of bathroom walls & floor
• Install vanity and Vanity Basin Pipe Waste
• Install side cabinet
• Install 10mm thick shower frameless glass & fixtures
• Plaster ceiling
• Paint ceiling (Dulux: Vivid White)
• Install downlights
• Install exhaust Fan
• Install electrical switch (3 Way)
• Install robe hooks
Items Supplied:
• All Wall & floor tiles
• Ceiling plasterboard (2 sheets)
• Vanity and side cabinet
• Shower Frameless glass
• Downlights (x4)
• Electrical switch
• Exhaust fan
• Robe hooks (x4)
• Tapware
Items needing to be supplied by Contractor:
• Subfloor base (FC Sheeting) ##
(Contractor to recommend)
• Wall sheeting to suit (AS)
• 600-800(l)x75(w)mm Stainless Steel (304 Grade) linear shower drain waste ^^ (with tile Insert)
• Square floor waste (304 Grade) with tile Insert ^^
• Frameless glass fixtures to suit
• All waterproofing materials etc
• Tile adhesives, grouting etc
• 3mm thick finishing Stainless Steel or Aluminium plate at Door threshold
(Contractor to recommend)
• 40mm P Trap Vanity Basin Pipe Waste to suit Supplied Vanity unit. (## TBC)
(Contractor to recommend)
• PVC pipe connectors etc.
Note 1
Shower head and plumbing location may need to be adjusted to suit. (TBC)
Note 2
Contract Electrician required to install downlights, exhaust fan and electrical switch. (AS)
Note 3
Demolition of the small bathroom (under 2000 x 2000mm) has been completed with the removable of all Wall/s and ceiling asbestos to AS, as well as, All floor tiles & concrete slab, and fixtures and fittings.
All existing hardwood timber structure/framework have been denailed and the area is clean and ready for immediate start.
The house is on concrete stilts (not slab) and the bathroom has 3 internal walls and one external.
Note 4
Draftman Floorplan, Elevation and Reflective Ceiling Plan have been complete and will be supplied as a PDF to scale (A3 size).
(## To Be Confirmed)
(^^ To be approved by client)
Please provide a competitive and fixed quote, including all materials & council fees (if required) needed to complete the job.
Images can be supplied of bathroom in current state.
Please provide:
ABN & BSA Numbers
2x Reference of previous projects (who aren't relatives or friends)
Multi Styles Tiling
Currently renovating need floors and wall tiled and water proofing.
currently renovating need floors and wall tiled and water proofing.
New shower screen, regrouting
I need someone to remove the old glass shower screen in my bathroom - supply...
Bathroom/toilet requires new shower and tiling done
Needs a new shower put in, some tiling done in the toilet and a small amount...
Sealing in bathroom, taps fixed
cracked tiles in bathroom around the grout and hot taps not working