Diana requested 3 quotes from Renovators in Cremorne
Renovating old bathroom. Remove all old material: tiles, bathtub, vanity and toilet. Waterproof floor area, create 2 new powerpoints, minor shifting of plumbing in laundry area and next to toilet. Re-tile with tiles from floor to ceiling. New plasterboard ceiling. New cornices. New downlight to vanity. Vanity and other joinery is being done separately. Shower screen to be provided separately.
Built By Dezign
NORTH SHORE HOME IMPROVEMENTS
Renovator Specialists
Bathroom renovation
Full bathroom renovation
- Bath/shower/toilet installation
- Tiling
- Sink...
Complete bathroom renovation new bath,toilet etc
Require complete bathroom renovation.needs re tiling wall and floor including...
Measure, supply and install frameless shower screens for 2 bathrooms.
For ensuite, 2 Panel Wall-to-Wall Frameless S/S (total length:1200mm). For...
Whole bathroom to be stripped including tiles bathtub and ceiling on 3rd flr
Want the whole bathroom to be stripped including tiles, bathtub and ceiling