Jay requested 3 quotes from Renovators in Port Melbourne
Bathroom has been stripped and bath frame built. bath needs to be set and final plumming needs to be done to bath.
tiles have been purchased - tiling to new bathroom needs to be done.
AllOver Painting and Design Pty LTd
The Inside Project
toilets 3,exist tiles on floor to be removed install & supply new sinks new plumbing
kindergarten to be renovated bathroom mutiple toilets 3 existing tiles on...
Towel rails installed bathroom-requires drilling in2 fully tiled wall
1 x double towel rail to replace current single towel rail to be attached to...
Hall requires a toilet upgrade & add toilet for disabled
Male & female toilets to be gutted & renovated, new tiles & fittings, etc....
I need a Renovator who specialises in Bathroom Renovation
I have a very small bathroom, just over 3 square meters. The stumps under the...