Marc requested 5 quotes from Plumbers in Williamstown North
Job entails four gasfitting tasks & one plumbing job. Gasfitting: removal of gaspipe that is still connecting to the disused wall heater, laying of a new gaspipe to fire place (3 metres) in preparation for change from wood-fired to gas-operated, laying of a new gaspipe to kitchen stove (2 metres), laying of a new gaspipe to attic (5 metres). Plumbing: a few slight alterations of the existing pipes is needed as part of a bathroom renovation. Relocation of taps for sink and bathtub. Possible slight alteration of water & seweridge pipe for toilet.
Bathroom work
Fit pipes to a new bathroom cabinet with sink (supplied). Pipes also feed to...
Relocate vanity and shower taps within same bathroom
Relocate vanity and shower taps within same bathroom in preperation refit
Remove existing gas cooktop, install new gas cooktop
Remove an existing 600mm gas cooktop (Simpson brand) and install a new 600mm...
Bathroom modification for disability
I work at disability client services and am currently assisting a family to...