We are getting solar hot water installed and have been told we need a gravel/rubble pit installed first, for the drain lines to discharge into. We are also planning to install a rainwater tank in the near future, so need advice on whether the same rubble pit can service both the hot water and rainwater tank drainage requirements. Open to changing the location of our hot water cylinder if it means a more efficient plumbing/drainage design!
Thanks!
Steve The Plumber
Connection of water tanks to toilet and laundry
We need connection of water tanks to internal toilet/s and laundry.
Change all water devices incl toilets inside/outside to comply with level 6-Griffin Park
Plumber- Change all water devices inside and outside to keep up with level 6...
Connect all downpipes to stormwater system
Connect all downpipes to stormwater system and possible installation of...
NEEDS 2 HAIR DRESSING INST
NEEDS 2 HAIR DRESSING BASINS INSTALLED