Rough in, install taps, hot water system

Darian requested 3 quotes from Plumbers in Don Valley

  Rough in so we can finish plastering. Move wastepoint for sink in kitchen, install hot/cold water lines, install bathroom taps (bath, shower, sink and washing machine) and waste, install instant gas hot water system.
Come back after plastering is finished to install fittings

Plumbers that Responded

Priority One Cooling and Electrical

BJT Airconditioning

Brendan Hay Plumber & Gasfitter

Quote Details

  • Suburb Don Valley, VIC 3139
  • Specialisation Home Renovation Plumbing
  • Date Listed 27 Nov 2019 - 11:12 am

Similar Quote Requests

New Bathroom
New Bathroom

SEPTIC TO CHANGE OVER TO REGULAR SYTEM
SEPTIC TO CHANGE OVER TO REGULAR SYTEM

Install two showers (1200x600) move existing plumbing.
Install two showers, 1200x900 and move exisiting plumbing. water needs to...

Install shower unit
Install shower unit - base & walls. Existing plumbing - may need to move...