Plumbing work for a bathroom renovation

Andrew & Gaye requested 4 quotes from Plumbers in Park Orchards

  This is a three stage job.
1) Disconnect current pipework & waste for vanity and shower to allow for demolition;
2) Rough in new shower pipeline and waste (which is moving in the bathroom) before room is tiled
3) Plumb new taps and waste for shower, vanity (not moving in the reno) and bath (also not moving) after tiling
(Tiling is not part of this job).

Plumbers that Responded

The Plumbing Professor - DNC

All Plumbed In

Hankin Plumbing & Gas

Booth's Plumbing & Gasfitting

Quote Details

  • Suburb Park Orchards, VIC 3114
  • Specialisation Home Renovation Plumbing
  • Date Listed 15 Feb 2013 - 1:39 pm

Similar Quote Requests

BATHROOM RENOVATION
BATHROOM RENOVATION

Agricultural Drain Install
cut concrete and install A.G. pipe along the side of house. Approximately...

Bathroom renovation
renovation

To install a bathroom with shower and vanity basin
There is a toilet which is next to the laundry. can a bathroom with shower be...