Plumbing for new house build.

Trevor requested 3 quotes from Plumbers in Ringwood North

  • New Two Storey House build in Ringwood North
About Us
• Trevor & Carolyn + 6 kids
• Land
Level Vacant Land in a court location

House Construction
• BV Ground Floor
• 100mm Polystyrene - First Floor
• Concrete Slab
• Rendered
• Colorbond Roof


SCOPE OF WORK REQUIRED
• Carry out all required plumbing work to relevant standard
• Please quote labour only (except for piping, fittings, etc) (GST Inclusive) for all work.
• Preliminary plumbing work prior to slab plus all other work required. Please indicate if anything is missing from the list or work that is not included.

1. Ensuite
a. 1 x Toilet
b. 2 x Basin
c. 1 x Shower
d. 1 x Bath
2. Powder Room
a. 1 x Toilet
b. 1 x Basin
3. Kitchen
a. 1 x Sink
b. 1 x Stove
4. Pantry
a. 1 x Sink
b. 1 x Dishwasher
c. 1 x Oven
5. Laundry
a. 1 x Sink
b. 1 x Washing machine taps
6. Living
a. 1 x Fireplace gas lines
7. Bath 1
a. 1 x Toilet
b. 1 x Shower
c. 2 x Basin
8. Bath 2
a. 1 x Toilet
b. 1 x Shower
c. 2 x Basin
9. Water Tank
a. Connected to laundry and upstairs toilets
b. Charged system
10. Downpipes as per plan
11. Hot Water Service
a. 2 x Gas Instantaneous (or recommendation)

12. Outdoor Taps
a. 4 outlets
13. Gas line to Alfresco area (for BBQ) (near kitchen)
14. Tap and drain to Alfresco area (near kitchen)

Plumbers that Responded

A & H Plumbing and Maintenance

Esteem Plumbing Services

Booth's Plumbing & Gasfitting

Quote Details

  • Suburb Ringwood North, VIC 3134
  • Specialisation New Home Plumbing
  • Date Listed 5 Jan 2014 - 12:41 am

Similar Quote Requests

Sewer & Stormawater Drainage required for new home (Pre Slab DrainageWorks)
Supply &Install Sewer Mains(up to 14 points approx) Supply &Install Storm...

Plumbing rough in
Need a quote for plumbing rough in for a new 2 storey residence

ROUGH IN OF NEW HOUSE
ROUGH IN OF NEW HOUSE

Construction of new home in croydon south, 2 story townhouse style.
I would like expressions of interests from all trades.