Graeme requested 3 quotes from Plumbers in Kenmore
To complete a stormwater solution as per designed plans. Require a digger with a small bucket - 150mm PVC pipe dug to 450mm deep with stormwater pits.
S&S BYRNE PLUMBING PTY LTD
	Leaking pipe between 2 panels in solar hot water syatem
	leaking pipe between 2 panels in solar hot water syatem
	NEEDS 2 HAIR DRESSING INST
	NEEDS 2 HAIR DRESSING BASINS INSTALLED
	INSTALL COOKTOP AND OVEN
	AND MAYBE A RANGEHOOD ALSO
	TWO STOREY BUILDING WATER LEAK
	TWO STOREY BUILDING WATER LEAK - ON THE CEILING ON TOP KITCHEN