Jacek requested 3 quotes from Plumbers in Robina
We need to move the sewer inspection point back 1.5m and move a length of piping to make way for pool. The inspection point is on our land and I've talked to council to see if it can be moved (it can). We will also possibly need to move storm water pipes.
	Fix water pipe
	Fix water main
	Bathroom plumbing changes
	shower mixer changed over, vanity and toilet replaced
	Undermount sinks need refitting
	The silicon(?) seal around the sink bowls are failing and both bowls need...
	Dishwasher installed
	need water in/out lets and power out let installed in kitchen