Installation of downpipe for carport to connect to water drainage system

Davy requested 2 quotes from Plumbers in George Town

  Supply labour and material to install 75mm downpipe from carport to absorption trench. Work require excavation of approximately 1M X 1M trench, installation of drain hoods, 40mm ballest back fill, removal of excess soil and supply all council documentation.

Quote Details

  • Suburb George Town, TAS 7253
  • Specialisation Drain Repair
  • Date Listed 9 Dec 2009 - 10:29 pm