Ged requested 2 quotes from Plumbers in Slacks Creek
					  Strip out a small bathroom in timber-frame 1970's house, remove a 2.1m non-load-bearing wall and combine bathroom with adjacent toilet.  Eliminate one door.  Reline and refit with new bath, shower and vanity (while retaining existing laundry chute if possible).
  
Coordinate carpenter, plumber, electrician and plasterer.  I will paint, tile and finish.
Mimimise job time as this is our only bathroom
				
Aaron Plumbing & Draining
Jopema Pty Ltd
	NEW BATHROOM FIT OUT
	NEW BATHROOM FIT OUT
	Connecting up sink and dishwashers in kitchen to external granny flat,overflow pipes need finishing
	plummer-connecting up sink and dishwashers in kitchen to external granny...
	Add new second bathroom to the house
	Add new bathroom to the house:
- new shower
- new toilet
- new basin
-...
	Bathroom reno
	Turn a walk-through bathroom into en-suite and add extra bathroom. Turning...