Michael Choi requested 3 quotes from Plasterers in South Melbourne
Plasterer
Supply and install Barrierboard in accordance with manufactures installation method including Barriseal throughout the compressor room excluding the ceiling. New installed Barrierboard should be in Good Condition ready to be painted.
Electrician
Disconnect and remove all existing GPO sockets and light switches within the compressor room. Upon completion of the Barrierboard and painting allow to reinstate the GPO sockets and light switches to return in Good Working Condition.
Painter
Supply and allow for undercoat and two coats of paint (to be specified). All works hould be completed in Good Condition.
Carpenter
Upon completion of painting allow to remove the existing compressor room door and replace with a new solid core door reinstating exisiting door hardware. Allow to supply and install door seal within the door frame. All works should be completed in Good Working condition.
SPECIALIST CONSTRUCTIONS PTY LTD
Allround Plaster Services Pty Ltd
Ceiling plaster work done.8x8 metres.als wall patching req.
Ceiling plaster work done.8x8 metres.als wall patching req.
Ceiling has cranks in plaster these need repairing in 2 room
ceiling has cranks in plaster these need repairing in 2 rooms, single story...
Builder requires small extension to be plastered. Includes walls and ceilin
Builder needs plastering of small extension in Albert park. Job includes...
Urgent Repair - to prevent or treat ceiling from dropping
Wall cracked (drought) -
section of cornice and ceiling above cracked wall...