Darran requested 3 quotes from Landscapers in Rochedale South
Raised approx 1 metre from level ground, wooden deck required with hand rail and roof and stairs. Approx 10 metres x 10 metres. Easy access. To fix to rear of house on one side.
TRD Construction
DeKING Pty Ltd
Prestige Building Maintenance
Require to cover open deck with timber.approx:6mx4, in back yard.
Require to cover open deck with timber.approx:6mx4, in back yard.Also have a...
Sandpit empited & sand replaced - Child Care Centre
Child Care Centre - 2 sandpits that need to have the old sand removed and new...
Decking installation
decking installation
Patio built in the backyard, color bond, steel frame
-
- Patio built in the backyard, color bond, steel frame