Retaining wall (supply and lay c&m link wall ab vertical blocks)

Rachel requested 3 quotes from Landscapers in Morang South

  Excavate and prepare footing
supply and lay c&m link wall ab vertical blocks on a concrete bed
supply and lay aggie drain and scoria behind wall to half way height
supply and liquid nail caps to block wall

Landscapers that Responded

Hire A Hubby

D M Dirtwork & Drilling

Quote Details

  • Suburb Morang South, VIC 3752
  • Specialisation Retaining Walls (less than 1 mtr)
  • Date Listed 7 Aug 2010 - 9:03 pm

Similar Quote Requests

Landscaping
approx 23 meter long retainer wall. 3-4 sleepers high. Require treated pine...

Retaining pine sleeper wall constructed 30m x 800-400mm high
I would like a timber (treated pine sleepers) retaining wall constructed....

Retaining wall
I am after ideas on a budget retaining wall required prior to concreting. The...

Remove old retaining wall and replace
I need an old retaining wall removed (will require moving/excavation of soil...