Pathway and steps required between garage and house

Ron requested 2 quotes from Landscapers in Morayfield

  We have built a curved block wall which now need a pathway built between the garage and house. It requires approx 3 - 4 steps. The length of the path will be approx. 8mtrs x 1.2mtr wide. We are unsure what type of material would match with our wall. exposed agregate, sandstone blocks, or other material) We are open to suggestions, but really want this completed ASAP. We do have photos of the site. We can forward these onto you to assist you in understanding our site details.

Quote Details

  • Suburb Morayfield, QLD 4506
  • Specialisation Paving & Stonework
  • Date Listed 28 Feb 2010 - 1:40 pm

Similar Quote Requests

Quote on paving required
Quote on paving required

Mowing edge to be laid
Mowing edge to be laid using small brick size pavers which are already...

APPROX 52 SQ METRES OF PAVING TO BE LAYED
15 sq mtr of paving to be lifted. 2 carports approx 15 sq mtr each to be...

Retaining wall
Approx. 30m retaining wall using concrete sleepers, existing wooden one...