Rachel requested 3 quotes from Landscapers in Mill Park
Create a capping layer around the perimeter of our home to reduce movement in house foundations.
Steps involved:
excavate to 300mm
create 200-300mm capping layer, compacting every 150mm
Level surface with 50mm fall per metre, away from house
pave on top
(Owner will supply Vicroads type A capping layer material and pavers)
Complete landscape construction
Lay Pavers in Alfresco Area
55 sqm to be paved. Crushed rock already laid and compacted and level. Sand...
Construct a retaining wall.
Construct 52 metres of 1.0m high, and 28 metres of 0.6 metre high retaining...
Paving driveway
Paving of front driveway using tumbled bricks supplied by client
Driveway...
Front yard only, minimalistic, very basic with black concrete driveway, no m'sments
Landscaping for front yard only, minimalistic, very basic with black concrete...