Klaus requested 3 quotes from Insulation Installers in Mornington
Supply and mount 2” foam insulation boards or batts underneath existing cathedral ceiling, between rafters which are about 550 mm apart. Seal remaining gaps with appropriate sealant or foam. Then mount tongue and groove timber boards to match existing wall cladding to cover the insulation and provide draught-proofing. Paint timber in specified stain – lime wash. Total area about 37 sqm. The job will require provision or rental of a working platform to be able to reach the top ceiling height of 4.85m.
Removal of blown in insulation and batts installed
Removal of existing loose insulation. Supply and install Batt replacement for...
Fibro shack roof insulation
Property at 25 You Yangs ave Dromana.
Small house. Using Govt rebate
Insulation in Roof Cavity
single story, three bedrooms, pitched roof, approx 15 squares of living...
Interior insulation and draught-proofing job
Supply and mount 2” foam insulation boards or batts underneath existing...