Rebecca requested 2 quotes from Handymen in Cranbourne
3.6mtr diameter whole (1mtr deep) dug into a backyard. Acess is tight, quote needs to have dirt removed included. (the dirt is good quality- not clay).
FRONT YARD MAKEOVER
FRONT YARD MAKEOVER
LEVELLING LAND,APPLYING NEW TOP SOIL
NEEDS EXCAVATOR TO LEVEL LAND & THEN NEEDS NEW TOP SOIL APPLIED
GENERAL LANDSCAPING / PAVING & DIGGING
GENERAL LANDSCAPING
Front, side and backyard needs to be filled, top soil and site levelling.
Front, side and backyard needs to be filled, top soil and site levelling.