Anh requested 3 quotes from Handymen in Summer Hill
					  Hi,
I need to remove the existing tiling in my bathroom (2m x 1.5), and toilet (2x1m) and then retile the floors. The floor space is open, with only a washing machine basin which will need to be removed and put back once the floor underneat is retiled. 
The job can be done immediately anytime before December 22.
				
	Remove old tiles on wall and flooring, laying new tiles
	wall tiles: around 23sqm.flooring tiles: around 12 sqm
	INSTAL MIRROR AND VARIOUS JOBS
	INSTAL MIRROR AND VARIOUS JOBS AROUND UNIT
	STEPS TO BE BUILT FOR PRAYER ROOM
	5 WOODEN STEPS TO BE MADE
	LOTS OF ODD JOBS
	LOTS OF ODD JOBS