Red brick pavers laid and pond removed

Shira requested 3 quotes from Handymen in Kensington

  Red brick courtyard has gaps in paving need to fill gaps with paving. Built up red brick pond also needs demolishing and removal of excess bricks that cannot be reused, dirt and debris

Handymen that Responded

Hire A Hubby

Quote Details

  • Suburb Kensington, VIC 3031
  • Specialisation Basic Landscaping
  • Date Listed 7 Mar 2014 - 7:31 am

Similar Quote Requests

Garden clean up
Front Garden: Weed garden, lay plastic and mulch top, wash down rear garden...

Landscaping – Loosening top soil for a front yard
Landscaping – Loosening top soil to a depth of 150mm (using Rotary Hoe or...

Tree Trimming
There are 2 trees (see attached photos) that need to be trimmed right down to...

Removal of approx 2.5 cubic metres of soil
We are in the process of re-doing our garden and have approx 2.5 cubic metres...