Already a Service Central user? Log in here
AC removal and Window Replacement in 2767
Handyman: Basic Carpentry
in Doonside, NSW 2767
5 July 2016
inda is after our service. She needs her window air conditioner to be removed out of her window and to replace the sheet glass. The sheet is a large fixed sheet that has a wire through it.
Fixinga closing line, thats haning offa brick wall
Handyman: Basic Carpentry
in Doonside, NSW 2767
7 June 2016
please call in regards to fixinga closing line, thats haning offa brick wall
Door jam and trim.
Handyman: Basic Carpentry
in Doonside, NSW 2767
25 August 2014
Rear external door jam and trim damaged by a dog scratching and chewing.
Shower screen is not aligning
Handyman: Shower Screen Repair
in Doonside, NSW 2767
6 August 2014
the door is not aligning with the side panel then shower water is coming out need to re-align it.
One flyscreen replaced on bedroom window
Handyman: Fly Screens
in Doonside, NSW 2767
5 January 2012
putting a flyscreen on a window in the bedroom that doesn't have one needs screen and mesh. Kitchen window also needs screen and frame.
3 doors to be supplied and hung - locks installed
Handyman: Door Repairs & Window Repairs
in Doonside, NSW 2767
3 November 2011
I need a back door, laundry door and garage door to be hung
Hole in wall of fibro house approx 400mm in diameter.
Handyman: Odd Jobs
in Doonside, NSW 2767
28 June 2011
need someone to attach chipboard to wall to cover hole(for security reasons - to stop anyone getting through it) until fibro sheet is removed and replaced.
1 glass panel of a 3 panel Shower Screen door is cracked and needs replacin
Handyman: Shower Screen Repair
in Doonside, NSW 2767
9 July 2009
The entire shower has been removed from the bathroom. Once tiling is completed I will also be looking for someone to refit the entire shower to the bathroom. Am open for the business to quote on...
Putting a 50 sqmeters concrete slab for my extention
Handyman: Basic Concreting
in Doonside, NSW 2767
24 December 2008
Ground work little prepared, final ground level has to do with roadbase material and do the piers hole (400mm dia) approx 15 nos make small trenches for beam 300mm deep and do the steel work and...