Patricia requested 1 quotes from Handymen in Ashwood
5 towel rails and one toilet roll holder need to be put onto the walls. they will be going into plaster and not into studs. i understand they are quite tricky as they are not round connections where there is room to move them a little. these are retangular so the connections onto the walls need to be precise as the towel rail needs to line up exactly with the initial connection to the wall and slip over the top - there isn't any room for jiggling them into position.
Massage chair replace small plastic wheel
I have got massage chair inside the small plastic wheel is crack. it make...
Supply&install a new hinge to side door of house,easy access
supply & install new hinge,as current one is broken on an aluminium side...
Light bulb to replace outside garage,fire alarms remove & replace in kitchn & corridor
Light bulb to be replaced on the outside of the garage,supply needed,easy...
Install back screen door, lounge door repair - keeps opening
install security screen wire backdoor, exisiting screen door replaced with...