Ann requested 3 quotes from Handymen in Ryde
					  Remove ground drainage clay half pipes, about 15-20m long along the side of the backyard and swimming pool edge.
After removal, cover the area with soil (in the garden) and concrete (paved area) to make the area flat
Need to be done by Sunday 21st February
Please feel free to call me to discuss the job.
Thanks
				
	Mower strip for corner property
	Hello. We need a concrete mower strip at the front of our corner property....
	Instal garden shed
	prepare concrete base for installing a garden shed size 2.26 x 1.52 x 2.08
	Concrete slab and assemble carport
	3 x 6 meters concrete slab with 100mm thickness and reinforced. assemble...
	Tile removal and condreating around pool
	We have a pool 17 years old we want to remove the old tiles and we have to...