Already a Service Central user? Log in here
Form up 1st floor suspended slab and concrete beams
Formwork: Formwork Concreting
in Kareela, NSW 2232
12 March 2014
Form up suspended concrete slab approx 7mx7m incorporating 2 400x400 concrete beams. May need scaffolding - Formwork props etc. will have to remain for a month before stripping
Formwork for two floating slabs
Formwork: Formwork Concreting
in Kareela, NSW 2232
29 January 2013
Two floating slabs need to be formed up for garage floor and decking. Both around 36m2 in area. Site ready to go in 2 weeks. Could use condek/bondek as alternative if cheaper.