Robert requested 3 quotes from Formworkers in Palm Beach
The pad is 247 meters square
the house is a single story
The foundation will be prepared over the next 8 weeks in anticipation of the pour
on top:
The concrete for the floors will be an off-white cement a 50-mm topping over the structural slab. The surface will be sealed using a traditional beeswax finish for protection against spills.
.
Garden Shed - Concrete Slab & Erect
I have a flat pack Garden Shed -
243w x 2.78d x 2.08h. I need a Rebated...
Repl queenslanders existing front/side decks. Install windows(supplied)
Replace a queenslanders old front and side vdecks to create: a) front...
Internal Doors, Balustrading, exhaust fan run to outside
Frame up and replace 5 internal doors (doors supplied but might need to be...
Build a LARGE dog house
I have a really large dog (stands about 6 foot when on rear legs and is just...