David requested 3 quotes from Formworkers in Emerald
Congrete raft slab with peers. Approx 25 cubic metres of concrete in total. Slab will have a 1 metre step down to a smaller slab that will be a workshop area. Concreters with the expertise in formwork should apply as block is back sloping and a retaining wall is needed.
Concrete laying for my backyard
Backyard about 6.1m X 9m
BEAMS ROTTEN
WOODEN BEAMS ROTTEN
ERECTION OF WALL, SMALL STAIRWELL
ERECTION OF WALL, SMALL STAIRWELL
22 METRES OF STRIP FOOTING, SOME FRAMING
22 METRES OF STRIP FOOTING, SOME FRAMING