Richard requested 2 quotes from Floorers in Box Hill
Three meter length of two year old floor needs repair where boards have split and lifted. The boards are NOT tongue/groove locked - the groove ends were butted at installation.
Remaining floor is in excellent condition.
Timber is blackbutt.
Problem is located in centre of large family/dining area.
Timber floor repair and 4sqm floor tiling in Ensuite
I have spotted gum timber floor and few timber need to be repair and need to...
Repair scuff marks on floorboard
Only a small job - Patch of floorboard are scuffed / discoloured and needs to...
Parquetry floor repair
parquetry floor around kitchen warped due to water damage. sanding and...
Fix 2nd floor squeaky floor
A small upstair's section of the house has squeaky floorboards under the...