Fred requested 0 quotes from Floorers in Bondi Junction
Floor leveling and possible laying of floating groove floorboards
Floor leveling required for the following areas in small semi: Lounge - 8 x 3m Bed 1 - 4 x 3m Bed 2 - 3 x 3m Bed 3 - 2.6 x 2.5 Existing carpet will need to be removed. Unclear at this stage the condition of existing floor. Must be able to quote on Friday 23 April (3pm - 7pm). This is the only time quoting is available. Must be able to commence work on Tuesday 27 April or Wednesday 28 April at latest. At this stage leveling only is required. There is a possibility of an installation job of pre-purchased floorboards depending on price and timing