Frank requested 2 quotes from Floorers in Yarraville
The concrete spoon drain has detached from where it was abbutting building and water is getting in between building and concrete spoon drain and getting in building. It is approx 18 mtrs long and the crack being approx 3 mill.
Tanking required on internal walls to solve dampness problem
Internal walls of shop has damp problems causing paint to peel and salt crust...
Concrete Polishing
Required for 2 rooms approx 5x3metres and 4 x 3metres.
STRIP FLOORING BACK, PAINT IT AND SEAL IT.
STRIP FLOORING BACK, PAINT IT AND SEAL IT. (SANDBLAST)
POLISHING OF CONCRETE FLOOR
INTERIOR