Ben requested 3 quotes from Excavation Experts in Willoughby North
We need a 25m long trench dug that needs to be 600mm deep. It only needs to be approximately 50mm wide. The block has easy street level access and there is plenty of room for a trenching machine for the whole length of the trench. I do not require the fill removed or the trench recovered, just for it to be dug by machine. I will do the hand trenching at either end myself. I would ideally like this work done right away so please let me know your availability.