Trenching for Power and Water line

Scott requested 3 quotes from Excavation Experts in Northgate

  Requires digging of a trench almost hard up against a fence and only 200mm to edge of the concrete driveway (trench is between the two). Expect it will require a side trenching attachment. Approx 40m long 100mm wide and up to 600mm deep. May encounter storwater and Sewage lines. I will try to have this resolved before the job starts.