Trenching,Boring

Vince requested 3 quotes from Excavation Experts in Bentleigh East

  Trenching of approximately 50mt @ a depth of 800mm minimum plus boring under a footpath, trenching of approximately 40mt @ a depth of approximately 600mm minimum plus boring under footpath. Will need a layer of crushed rock @ back filling

Excavation Experts that Responded

Salvatore's Plumbing

Azpire Plumbing and Gas Fitting

SKS CONNECT PTY LTD

Quote Details

  • Suburb Bentleigh East, VIC 3165
  • Specialisation Trenching
  • Date Listed 30 Apr 2013 - 5:58 am

Similar Quote Requests

Excavation footings for front fence to be dug
Dig out and remove approx lineal metres of strip footings for front wall....

Excavating and cncreting
excavation and concreting required to make ready for brick fence and piers.

Trenching for telephone cable
Please quote on digging & trenching for telephone / broadband cable...

REMOVE CONRECTE PATHWAY AND OLD DRIVEWAY
REMOVE CONCRETE PATHWAY AND OLD DRIVEWAY